INGTOP Métal – Service pits for passengers cars JBR 10

SERVICE PIT JBR 10  – PASSENGER CARS

Technical description

SERVICE PIT DIMENSIONS
Width 1.3 m
Height 1.5 m
Length 8 m
Pitch between HEB 140 – U 180 sections – 850 mm
Loading capacity – maximal load 10.000 kg
Load from axles 4 x 2.500 kg
Load from lifting jack for a wheel 4 x 1.000 kg
FRAME MATERIAL COMPOSITION

Material

quality S 235
Sections U140
Frame metal sheet 3 mm thickness

Total mass with axial cases 2 966 kg
(without grid flooring, width 990 mm)


Basic Equipment of the Service Pit

AIR-CONDITIONING EQUIPMENT

Fresh air supply (DN 100) according to ČSN 73 6059 – 3.

COMPRESSED AIR DISTRIBUTION

2 connecting points + distribution

ELECTRICAL INSTALLATION

Lighting – 4 pieces of swivelling lamps
Plug sockets – 2 pieces 230 V
Cables
Circuit breakers – 2 pieces
Installation
Review and electro documentation
Switchboard

 

AXIAL EXTENSION FOR CLEARANCE DETECTOR

The axial extension is designated for storage of technological equipment for geometry
alignment of wheels. The axial extension of the service pit is produced from steel plates
and sections. Inputs for electrical installation and drainage of liquids are made in the axial
extension of the service pit.

OTHER EQUIPMENT

Stairs with 7 steps, length 1,5 m – 1 piece (one step height 188 mm)
Ladder – 1 piece (entry side)
Grid flooring with a sump
STYRODUR insulation of 20 mm thickness – light blue
Basic and top coating (finish coat RAL 7035a, finish coat inertol Sika poxitar F- shade 9017)

PACKAGING

Wooden blocks
Ascendable wooden covering
Foil covering

OTHER SERVICES

Documentation elaboration – drawings of main assemblies, technical report, electro project, air-conditioning, diagram of connecting points
Elaboration of construction readiness documentation – it is not designated for building approval
Cooperation with construction designer
Service pit loading
Supervision prior to concrete works within the area of 100 km far from Týniště n. O. (necessary condition for guarantee observance)


Individual stages of construction readiness

PLACING THE SERVICE PIT ON THE BASE PLATE AND SCHEME OF CONCRETE WORKS

1st stage –excavation pit realization
2nd stage – base plate preparation
3rd stage – placing the service pit on the base plate
4th stage – connecting of the service pit with the service floor



Manufacturer’s website : INGTop Métal

Product PDF :  INGTop Métal-JBR10

Catalogue : fosse-maintenance